HUFCOR (Asia Pacific) - E-Newsletter #3
if you are unable to see the message below, click here to view.
|
|
Feature Story - Brand New Regional Headquarters in Hong Kong
Marking 22 years of operations in Asia Pacific, we recently moved our regional headquarters to a new location in Hong Kong. We are pleased about the location in Harbour City, Tsim Sha Tsui, which is a downtown city center bustling with people and activities. With panoramic sea view of the Victoria Harbour, world class hotels and restaurants, this move to downtown also brings us closer to many of our customers.
|
Product Highlight - 600 Series
|
Remark: 600 Series is manufactured at our facility in Panyu, Guangzhou, China.
|
600 Series Operable Partitions –
The Ultimate Solution in Flexible Space Management
The 600 Series are the embodiment of innovation and aesthetics combined. Its welded, galvanized and heavy-duty steel frames provide flexible, versatile and space-saving solutions, together with newly designed acoustical features for industry leading durability and acoustic performance of up to STC 54.
Glasswall 600G - Combination of Aesthetic & Excellent Acoustic Performance
The function of 600 Series is now enhanced with glass aesthetics. This double glazed Glasswall 600G beautifully heightens the sense of spaciousness with an acoustic performance of up to STC 48.
|
|
Asia Pacific Project News
|
Hong Kong and Macau
Shatin Baptist Church
|
Mainland China
Guangzhou W Hotel
|
South-East Asia
Nexus 5, Malaysia
|
Product
|
:
|
Operable Partitions –
Aluminum 5000R
|
Panel height
|
:
|
2.5M
|
Completion
|
:
|
June 2013
|
|
Product |
: |
Operable Partitions –
600 Series
|
Panel height |
: |
10M
|
Completion |
: |
June 2013
|
|
Product |
: |
Operable Partitions –
Classic™ 7000 Series
|
Panel height |
: |
8M
|
Completion |
: |
August 2013
|
|
|
New & Upcoming Projects
|
Hong Kong and Macau
• |
West Island School - 4 panels of Glasswall 600G; panel’s height at 2.5M; completed in August 2013 |
• |
Kaplan Financial - 49 panels of 5000R operable partitions; panel’s height at 2.4M; completed in September 2013 |
• |
Hong Kong Convention and Exhibition Centre - 31 units of
Roommate™ movable partitions; panel’s height at 2M; estimated completion in September 2013 |
• |
Bank of China Tower - 22 panels of 600 Series operable partitions; panel’s height at 2.7M; estimated completion in October 2013 |
• |
Chinese University of Hong Kong (Student Hostel) - 19 units of 5000R operable partitions; panel’s height ranging from 2.5M to 3.2M; estimated completion in October 2013 |
• |
Macao Museum of Art - 16 panels of 600 Series operable partitions; panel’s height at 3M; estimated completion in November 2013 |
|
Mainland China
• |
Langham Place Guangzhou - 206 panels of 600 Series operable partitions; panel’s height at 9.5M; completed in July 2013 |
• |
Lanhouse Restaurant Beijing - 7 panels of 5000R operable partitions; panel’s height at 4.1M; completed in July 2013 |
• |
Hyatt Regency Chongming Jinmao - 36 panels of 600 Series operable partitions; panel’s height at 7M; completed in August 2013 |
• |
Wanda Realm Nanjing Jiangning Hotel -40 panels of 600 Series operable partitions; panel’s height at 8.5M; completed in August 2013 |
• |
New World Hotel Beijing - 13 panels of 600 Series operable partitions; panel’s height at 6.5M; completed in September 2013 |
• |
Libao Pavilion Shenzhen - 31 panels of 5000R operable partitions; panel’s height at 4.3M; estimated completion in November 2013 |
|
South-East Asia and South Asia
• |
Taylor’s College, Bandar Sunway, Malaysia - 19 panels of 5000R operable partitions; panel’s height at 6.1M; completed in September 2013 |
• |
CIMB Bank, KL Sentral, Malaysia - 9 panels of 5000R operable partitions; panel’s height at 2.8M; completed in September 2013 |
• |
Kinrara Golf Club, Malaysia - 28 panels of 5000R operable partitions; panel’s height at 4.5M; estimated completion in November 2013 |
• |
United World College, Singapore - 6 panels of 5000R operable partitions; panel’s height at 2.8M; estimated completion in December 2013 |
• |
SMU, School of Social Science, Singapore - 6 panels of Glasswall GL1; panel’s height at 2.9M; estimated completion in December 2013 |
• |
Le Meredien Mahabaleshwar, India - 12 panels of 5000R operable partitions; panel’s height at 3.6M; estimated completion in December 2013 |
|
|
Contact us Unsubcribe
© 2013 HUFCOR Asia Pacific Ltd. All rights reserved. No part of this publication may be reproduced, stored in any retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise without the publisher's prior written permission.
|
|
|
|